Ready to see the new house? We are so ready to show you! This baby was a labor of love that took 4 months to build. It was the longest four months ever but it came together beautifully.
The Exterior: We plan to add wood corbels in the roof peaks, carriage hardware on the garage doors (might paint the doors to match the trim eventually too), shutters and a wood window box to that front window and finally, landscape.
The Entryway: I will eventually add wainscoting but for now I just want to add a mirror and console table, rug and new lighting. We will be changing all the hardware to black down the line too.
The Laundry Room: I want to add a wood shelf above the washer/dryer and maybe some trim on the walls. Keeping it simple.
The Master Bedroom: I fell in love with the high ceilings in this room and would someday love to have a huge wood beam in the peak. I'm thinking of maybe painting this room a grey/sage color and adding some trim or wainscoting to the walls. Again, hardware and lighting will be changed.
The Guest Room: Not sure how I didn't snag a picture before we moved in but its the same as everything else. Changing lighting and hardware, adding blinds and curtains and possibly and accent wall down the line.
I cant wait to show you what it looks like now. Just adding furniture and unpacking some decor has made a huge impact already. Til next time!
---Jackie
No comments:
Post a Comment